Detailed Design of the Marking System of the Sava River Waterway on the B&H Marking Sector

On April 23, 2008, in Zagreb, the Contract on development of the Detailed Design of the Marking System of the Sava River Waterway on the B&H Marking Sector was signed between the Sava Commission and the Agency for Inland Waterways from Vukovar (Croatia).

Deadline for development of the Detailed Design of the Marking System of the Sava River Waterway on the B&H Marking Sector is 60 days.