Drugi Načrt upravljanja voda za Savski bazen

Following the approval of the first Plan at the 5th Meeting of the Parties (Zagreb, December 2, 2014), activities of the second RBM planning cycle started in 2016 and continued thereafter.
Preparation of the 2nd Sava RBMP is aimed at linking water resources and river basin management with the integrated and sustainable socioeconomic development of the riparian countries.
Based on the second Sava River Basin Analysis Report and Interim Overview of the Significant Water Management Issues in the basin, an outline of the 2nd Sava RBMP has been developed with a special attention to the weaknesses and gaps identified in the first plan. Further steps towards the development of the second Sava RBMP are carried out at the expert level, through work in the related ISRBC expert groups.