Consultation on the draft Sava FRMP run from 31 October until 01 December 2018.

 

A total of 160 comments on the draft Sava FRMP were received. During the response process 61 comments were justified while 99  comments were not accepted. Out of 61 justified comments, for 45 comments it was concluded that the corrections/enhancements in the text of the Sava FRMP should be made.The whole process of public involvement in preparation of the draft Sava FRMP has been elaborated in the following document:

Summary of the public participation acitivites related to preparation of the draft Sava FRMP - eng

Summary of the public participation acitivites related to preparation of the draft Sava FRMP - cro

The final draft Sava FRMP, with the enhancements made on the basis of justified comments, will be available for download from this site. 